20+ years combined team experience — Call (408) 634-6655 →
ADU Design & Drafting

Complete ADU design and permit-ready drawings, from first measurement to plan check.

Detached, attached, garage conversion or junior ADU: one team designs it, draws the full permit set, prepares the Title 24 report and coordinates your engineer, then answers your city's plan check comments.

Get a Free Quote Call (408) 634-6655

What are you building?

Pick a project type and we'll scroll you to the request form.

Get My Free Quote

FREE · NO OBLIGATION

ADU Types

Which kind of ADU are you planning?

Each type has its own rules, set by state law and by your city. We check your city's current ADU page before we design anything.

Detached ADU

A new stand-alone unit in the yard. We design the layout and draw the site plan, foundation and framing details around your lot, your city's setbacks and your utility connections.

Check your lot →

Attached ADU

A unit built onto the house or sharing a wall with it. The design has to work with the existing structure, rooflines and energy compliance of the main home.

Check your lot →

Garage conversion

An existing garage turned into a living unit. We measure what is there and draw the changes, including the structural and energy items a conversion usually brings up.

Check your garage →

Junior ADU (JADU)

A small unit created inside the existing home. JADUs carry their own rules, which your city's ADU page spells out, so we confirm them early.

Check your home →

What's Included

One team from first measurement to your city's last comment.

Site Visit and Measurements

We look at the property and measure what exists, so the drawings start from real conditions, not a satellite photo.

ADU Design and Layout

A floor plan and site plan that fit your lot, your city's ADU standards and how you plan to use the space, whether for family, a tenant or both.

Full Permit Drawing Set

Site plan, floor plans, elevations, sections and construction details, organized to your city's submittal checklist. See Permit Sets.

Title 24 Energy Report

The energy compliance documentation your city asks for, prepared by the same team. See Title 24 for ADUs.

Engineering Coordination

If your ADU needs structural calculations or a licensed engineer's review or stamp, we coordinate it as part of the same project. See Engineering Review & Stamps.

Plan Check and Corrections

We prepare and organize your application, then respond to your city's comments with revised drawings until the review is complete.

What Permit-Ready Means

A drawing set built around your city's submittal checklist.

Permit-ready means the drawings are complete and organized the way your city's building department asks for them, so a reviewer can follow them without guessing. It does not mean the city has approved them. Plan check is the city's review, and reviewers often have comments, so we stay on the project through the corrections instead of handing you a set and walking away. Requirements differ by city and change over time, so we start from your city's current ADU page and checklist.

How It Works

From first conversation to a permit set your city can review.

Click a stage, or let it play — this is the path from an ADU idea to a submittal.

Feasibility Review
Site Visit and Measure
Design and Layout
Permit Drawing Set
Submittal Package
Plan Check and Corrections
01 / 06

Feasibility Review

We look at your lot, your goals and your city's ADU rules to see which type of ADU is realistic and what to check first.

0%
Good To Know

What sits outside our drawings.

Depending on your site, a few items are handled by other licensed professionals or paid to the city. We tell you early which ones apply to your project.

Survey and soils

A licensed land surveyor provides boundary and topographic surveys, and a geotechnical engineer provides a soils report, when your site or city calls for them.

Fire and utilities

Some sites need fire sprinkler design or utility connection work from licensed specialists, depending on your city and the lot.

Fees and HOA

Permit, plan check and any connection or impact fees are paid to the city or utility. If you have an HOA, its approval is a separate step.

Construction

We prepare drawings and paperwork. Construction is done by your licensed contractor, and the city handles inspections.

Plan Ahead

Free tools and guides for planning your ADU.

From the guide library

Service Areas

Also drafting nearby.

Based in San Jose, working throughout Santa Clara, San Mateo and Alameda counties and the wider Bay Area.

Code violation & red tag removal

Tell us about your ADU idea.

Share the city and what you have in mind, and we'll tell you what to check first and what a realistic scope looks like.

Get a Free Quote
FAQ

Questions homeowners ask us

We start with a site visit and measurements, then design the layout, draw the full permit set (site plan, floor plans, elevations, sections and details), prepare the Title 24 energy documentation, coordinate any structural engineering, and respond to your city's plan check comments. We confirm the exact scope with you before work begins.

It means the drawings are complete and organized to your city's submittal checklist. It does not mean the city has approved them: plan check is the city's review, and reviewers often have comments. We respond to those comments with revised drawings.

Yes. We draw detached ADUs, attached ADUs, garage conversions and junior ADUs. Each type has its own rules on things like size, entrances and parking, set by state law and your city, so we check your city's current ADU page before designing.

Setbacks, lot coverage, height limits, utilities and access all matter, and cities apply them differently. Our ADU feasibility checker gives a planning-level answer in a few minutes, and we confirm the details against your city's rules and your actual lot during the first review.

Yes. We prepare the Title 24 energy documentation. If the design needs structural calculations or a licensed engineer's review or stamp, we coordinate that as part of the same project.

We do not build, survey or do soils testing, and we do not collect permit or impact fees for the city. Construction is done by a licensed contractor, surveys and soils reports by licensed specialists when needed, and the city handles inspections. We tell you early which of these apply to your site.

It depends on the type and size of the ADU, the condition of the site and how your city's review goes, so we do not quote numbers on this page. The drafting fee estimator and project timeline estimator give planning-level ranges, and after a short conversation we can describe the scope for your project.

That is a different path. If the unit was built without a permit before 2020, see our ADU and JADU legalization (AB 2533) page. For other unpermitted work, see our unpermitted work legalization page.

Related services

ADU & JADU Legalization (AB 2533) →Title 24 for ADUs →

Free, No-Pressure Estimate

Let's talk about your project.

Tell us what you're building and we'll get back to you with next steps — usually within one business day.

(408) 634-6655