A violation notice or red tag anywhere in the Bay Area starts the same way: accurate as-built drawings of what was actually built. Where it goes from there depends on which city or county has jurisdiction over your address.
There is no single "Bay Area" code enforcement office. Every incorporated city runs its own building department and its own enforcement process, and the unincorporated parts of Santa Clara, San Mateo and Alameda counties are handled by the county, not by the city whose name is on your mailing address. Two homeowners with the same unpermitted garage conversion can face different checklists, different review steps and different ways of getting the work legalized, simply because their parcels sit in different jurisdictions. Some agencies have special legalization or amnesty-style programs for certain kinds of unpermitted work, such as older unpermitted ADUs, and others do not, so it is worth asking what is available where you are. The themes repeat, though: unpermitted ADUs and garage conversions, additions built without plans, work in hillside, fire, flood or historic overlay areas, and problems that surface during a home sale. Each city we work in has its own page, from San Jose to Redwood City to Fremont. This page is the regional overview for everyone else, and for anyone not yet sure which agency is in charge. Our role is the drawings, calculations and documentation side of getting back to compliance.
We read the notice, work out exactly what the issuing agency is asking for, and prepare the as-built drawings and documentation that move the file toward review, wherever your property is.
Measured as-built plans and a retroactive permit package for converted garages, backyard units and other living space built without permits, prepared for your specific city or county.
Accurate drawings of additions, decks, structural changes and remodels as they actually exist, plus the after-the-fact permit set your building department asks for.
If unpermitted work comes up in an inspection report or during escrow, we assess what documentation exists, what is missing and what a realistic path to resolving it looks like.
We read the red tag, notice of violation or inspection report, confirm which agency issued it, and identify what that agency is actually asking for.
We measure the unpermitted construction as it exists on site and draw it accurately, not as it should have been built.
A retroactive permit set prepared for your jurisdiction, with Title 24 documentation and engineering coordination where the work calls for them.
When the building department sends corrections or questions, we revise and resubmit the drawings and documentation until your package has been fully reviewed.
We work on retroactive permits and as-built documentation regularly, so we know what building departments expect to see in an after-the-fact submittal.
Drawings are based on on-site measurement of what is really there. Reviewers compare the paperwork to the building, and mismatches slow everything down.
When unpermitted structural or energy-related work needs a licensed engineer's evaluation or compliance documentation, we coordinate it as part of the same project.
You deal with the same person from the first look at your notice through resubmittals, instead of being passed between a drafter, an engineer and a consultant.
Violation notices, red tags and unpermitted work across Santa Clara, San Mateo and Alameda counties and the wider Bay Area.
There is usually a well-worn path, and you are in good company: unpermitted work turns up on many Bay Area homes, and building departments handle legalization submittals all the time. It typically starts with accurate as-built drawings, followed by a retroactive permit package scoped to what the agency that has jurisdiction over your property requires. If part of the work cannot be approved as built, the agency that has jurisdiction over your property may ask for corrections, and we flag the items we notice early so you can plan around them. How it plays out depends on that agency's requirements and on what was built, and we walk through that with you once we have seen the notice.
No. We handle the drawings, permit documentation and Title 24 side of resolving a violation. We do not provide legal advice, represent you in enforcement proceedings or negotiate penalties. If you have questions about fines, deadlines, liability or your legal rights, talk to a qualified attorney.
Your mailing address is not a reliable guide, because many unincorporated areas use a nearby city's name. Check the notice itself for the issuing agency, or look up your parcel on the city's and county's online maps or ask their planning counters whether the parcel is inside city limits. If you send us your address and the notice, we can help you confirm it.
It usually means the agency believes work was done without the required permits or approvals, or that a condition on the property needs to be corrected. A red tag is typically posted on site and may stop work or limit use of the space, while a notice of violation is usually a letter that sets out what is flagged and how to respond. It is a starting point for getting documents in order, not a permanent verdict.
Read the notice carefully and note any response dates and the contact it names. It is usually sensible to contact the issuing agency, and to speak with an attorney if you have legal concerns. Send us a copy as well so we can tell you what drawings and documentation will be needed.
We cannot predict any agency's timeline. It depends on the jurisdiction, how busy its building department is, how complete your submittal is and how many corrections come back. Drawings prepared accurately against the agency's actual requirements tend to avoid avoidable delays.
Tell us what you're building and we'll get back to you with next steps — usually within one business day.
(408) 634-6655