Stop-work notice, violation letter or red tag in Los Altos? We prepare the as-built drawings, retroactive permit sets and Title 24 documentation that Development Services needs to review the work, with Los Altos's zoning and design review standards in mind.
In Los Altos, building permits, planning review and code enforcement all sit inside the Development Services Department. The Building Division handles plan review and inspections, the Planning Division handles zoning and design review, and Code Enforcement follows up on municipal code complaints and works with both. A case can begin with a report through the city's online form, an inspector noticing work with no permit on file, or a buyer's inspection during a sale. The city's building code amendments may address this situation, so check the current text with the city: they may provide for higher permit and plan-review fees when work began without a permit, set short windows for responding to a violation notice or stop-work notice, and say that paying the higher fees does not excuse the work from meeting zoning. That matters on Los Altos's larger lots, where height, setbacks and design review get real scrutiny, and where parcels near Adobe, Hale, Permanente and Stevens creeks can sit in a flood zone. None of this changes the first step: the city needs accurate drawings of what is actually built, and measuring and documenting it is the part we do. We are not attorneys, we do not negotiate fines and we do not do the construction.
We read the stop-work notice, violation letter or red tag and identify what Los Altos is actually asking for before you spend money on anything else.
For a garage, studio or other space converted to living use without a permit, Los Altos treats ADUs as a building permit review with no public hearing, and state legalization rules for certain pre-2020 units may apply. We draw the existing conditions with both in mind.
Accurate drawings of additions, enclosed porches, remodels and detached structures exactly as built, then a retroactive permit set scoped to what Building and Planning require, with Title 24 documentation and engineering coordination where the work triggers them.
If a buyer's inspection, permit-history search or appraisal turned up a finished garage, addition or detached studio the city's records do not reflect, we assess what documentation exists, what is missing and what it would take to resolve.
We go through the violation letter, stop-work notice or inspection findings line by line, note the response dates and list what Los Altos is asking for, so the drawings address the actual items.
We visit and measure what was actually built, including additions and detached structures on larger lots, and produce existing-condition drawings rather than assumptions based on old plans.
A retroactive permit set for the Building Division, with Title 24 documentation and engineer coordination where the scope calls for them, plus the site plan and elevation detail Planning may want for design review.
When Building or Planning staff come back with corrections or comments, we revise the drawings and resubmit until your package has been fully reviewed.
As-built and legalization work is a regular part of what we do, so reading a Los Altos notice and knowing what Building and Planning staff expect in a retroactive submittal is familiar ground.
Drawings come from field measurements, not old plans or memory, which matters on larger lots where additions and detached structures may never have made it onto the original set.
If unpermitted structural, electrical or energy-related work needs an engineer's evaluation or Title 24 documentation, we line it up as part of the same project.
One person handles your drawings and your questions, from the first read of the notice through any correction rounds.
Violation notices, red tags and unpermitted work across Santa Clara, San Mateo and Alameda counties and the wider Bay Area.
There is usually a well-worn path, and you are in good company: unpermitted work turns up on many Bay Area homes, and building departments handle legalization submittals all the time. It typically starts with accurate as-built drawings, followed by a retroactive permit package scoped to what Los Altos requires. If part of the work cannot be approved as built, Los Altos may ask for corrections, and we flag the items we notice early so you can plan around them. How it plays out depends on Los Altos's requirements and on what was built, and we walk through that with you once we have seen the notice.
No. We handle the drawings, permit documentation and Title 24 paperwork. We do not give legal advice, represent you in a hearing or negotiate fines. If you have questions about your legal rights, an administrative citation or an appeal, please talk to an attorney.
In general, it means the city believes work was done without a required permit or is out of line with code or zoning. In Los Altos, building and code enforcement sit together in Development Services, so a notice may come from the Building Division or from Code Enforcement, and a posted stop-work notice should be left in place. Send us a copy and we will go through it with you.
Read the notice for who issued it and every response date. Response windows can be short, and missing one may lead to additional fees or citations, so do not wait. Send us a copy right away, and we will tell you which drawings the response needs and what to ask the Building Division. Los Altos Hills is a separate town, so a notice from there may follow different rules.
We cannot predict the city's timeline. It depends on the scope of the work, whether Planning or design review applies on top of building plan check, whether an engineer's evaluation is needed, and how many correction rounds follow. Your notice may also set dates for applying for a permit, so keep a close eye on them. We can estimate our own part once we have seen the notice and the home.
Los Altos applies design and zoning review to many single-family projects on top of building plan check: smaller additions generally get staff-level review, new two-story construction generally goes to a noticed public meeting, and ADUs follow the building permit route. Unpermitted work may be measured against the same standards, and the city's building code amendments say that paying higher fees does not excuse zoning compliance. A Historic Resource Inventory listing or a flood zone can add review too. The Planning Division decides what applies, and we flag the likely items at the site visit.
Tell us what you're building and we'll get back to you with next steps — usually within one business day.
(408) 634-6655