As-built drawings, permit documentation and Title 24 coordination to legalize an older unpermitted ADU or junior ADU under California's AB 2533, working with your city's own process.
AB 2533 took effect on January 1, 2025. For an ADU or junior ADU built without a permit before January 1, 2020, it says a city or county generally may not deny a permit because the unit breaks building standards or local ADU rules, unless correcting the problem is necessary to fix the health and safety conditions that make a building substandard. Cities and counties have to publish a checklist of those conditions, and the law says they generally may not charge impact fees or connection and capacity charges, with limited exceptions. Ordinary permit and review fees can still apply, and every city runs its own process, so the details for your unit depend on where it is.
The ADU or junior ADU was built or converted without a permit before January 1, 2020. Garage, basement and backyard conversions are the common examples.
Cities usually ask for evidence of when the unit was built, such as dated photos, aerial images, utility or rental records. Each city decides what it accepts.
The unit meets the state definition of an ADU or junior ADU, and zoning allows an ADU on the property. Some cities also expect that no permit application for the unit is already open.
Substandard conditions, such as serious fire, structural, electrical or sanitation hazards, have to be corrected before the unit can be permitted. The city's checklist spells out what it looks for.
Click a stage, or let it play — this is the path from an unpermitted unit to a legalization submittal.
We look at when and how the unit was built, what evidence of the build date exists, and which steps your city's program asks for.
Accurate drawings of the unit exactly as it was built, which cities ask for in place of old or missing plans.
The forms, checklist and drawings your city asks for, organized so the reviewer can follow them without guessing.
Energy compliance paperwork where the unit's envelope, HVAC or water heating calls for it.
We map your city's substandard-housing checklist onto your unit and show which items may need correction, so you can price the work with a licensed contractor.
If a structural item needs a licensed engineer's evaluation, we coordinate it as part of the same project — see Engineering Review & Stamps.
We respond to your city's questions and corrections with revised drawings, until the submittal has been fully reviewed.
San Jose, Fremont, Hayward, Milpitas, Mountain View and Pleasanton each publish information on legalizing older unpermitted ADUs, and other cities handle it through their regular ADU process. Names, steps and forms differ from city to city and change over time, so we check your city's current page first.
Under AB 2533 the process generally starts with as-built drawings of the unit, evidence of when it was built, and your city's safety checklist. The city reviews the plans, may inspect the unit for health and safety, and approves the permits needed for any corrections. How your case plays out depends on your city's process and the condition of the unit, and we walk through that with you once we have seen it.
Cities generally ask for evidence that the unit existed before January 1, 2020. Examples include dated photos, aerial or satellite images, utility or rental records, and similar documents. Each city decides what it accepts, so we check your city's page first and tell you what to start gathering.
AB 2533 says the city may not penalize you for having the unpermitted unit, and it generally may not charge impact fees or connection and capacity charges, with limited exceptions. Ordinary permit and plan review fees can still apply, and the exceptions depend on your unit, so confirm the details with your city.
The law is built around health and safety. A city generally cannot deny the permit because the unit does not meet current building standards or local ADU rules, unless correcting that item is necessary to fix a substandard condition. Items on your city's substandard-housing checklist, such as fire, structural, electrical or sanitation hazards, may need correction, and the city decides what applies to your unit.
That depends on your city and the facts, so ask the city and, for legal questions, an attorney. We are not a law firm and do not give legal advice. If you have a notice, our code violation page explains how we help, and accurate as-built drawings are usually the same starting point either way.
No. We prepare drawings, permit documentation and Title 24 paperwork, and we coordinate with licensed professionals. Any corrective construction is done by a licensed contractor, and the city does the official inspection. A homeowner can also get a confidential third-party inspection from a licensed contractor before applying, and we can coordinate that.
Tell us what you're building and we'll get back to you with next steps — usually within one business day.
(408) 634-6655