Red tag, stop-work order or Code Enforcement notice in San Jose? We prepare the as-built drawings, retroactive permit sets and Title 24 documentation that Planning, Building and Code Enforcement (PBCE) needs to review the work.
In San Jose, building permits are handled by the Building Division and violations are handled by Code Enforcement, both inside the Planning, Building and Code Enforcement department. A case usually begins with a complaint, a proactive inspection or referral, or a problem found during a home sale. Once Code Enforcement confirms a violation, the city issues an enforcement notice that outlines the violations, the required corrective actions, potential fines and a deadline to comply. If a notice stays unresolved, the city's published process allows for citations, daily fines and other remedies, which is why reading the notice carefully and acting on it early matters. For unpermitted work, the city points owners to its Permit Center and online permit system to get the proper permits, and Code Enforcement inspectors can guide you through the process. Whatever the next step turns out to be, accurate drawings of what is actually built are usually a useful place to start. That is the part we do: measure the existing construction, draw it, and prepare the permit package for the city to review. We are not attorneys, we do not negotiate fines, and we do not do the construction. We handle the drawings and documentation side.
We read the notice or red tag, identify what San Jose is actually asking for, and prepare the as-built drawings and documentation that the next step requires, before you spend money on anything else.
Garages, basements and backyard structures turned into living space without a permit are common in San Jose. We draw the existing conditions and prepare the legalization package, taking into account the state and city ADU legalization pathways that may apply.
Accurate drawings of the work exactly as it was built, followed by a retroactive permit set scoped to what the city requires, including Title 24 documentation and engineering coordination where the work triggers them.
If a buyer's inspection, a permit-history search or an appraisal flagged unpermitted work on a San Jose home, we assess what documentation exists, what is missing and what it would take to resolve.
We go through the enforcement notice, red tag or inspection report line by line and list what the city is asking for, so the drawings address the actual items.
We visit the property, measure what was actually built and produce accurate existing-condition drawings, not assumptions based on old plans.
A retroactive permit set prepared for San Jose's building permit process, with Title 24 documentation and engineer coordination where the scope calls for them.
When the city's reviewers come back with corrections or questions, we revise the drawings and resubmit until your package has been fully reviewed.
We work on as-built and legalization projects regularly, so we know how to read a notice and what a building department needs to see in a retroactive submittal.
Every drawing is based on field measurements of what is actually there. Accurate existing conditions are what the rest of the process depends on.
Where unpermitted structural, electrical or energy-related work needs an engineer's evaluation or Title 24 paperwork, we coordinate it as part of the same project.
You deal with the person doing the drawings from the first notice review through resubmittals, not a call center.
Violation notices, red tags and unpermitted work across Santa Clara, San Mateo and Alameda counties and the wider Bay Area.
There is usually a well-worn path, and you are in good company: unpermitted work turns up on many Bay Area homes, and building departments handle legalization submittals all the time. It typically starts with accurate as-built drawings, followed by a retroactive permit package scoped to what San Jose requires. If part of the work cannot be approved as built, San Jose may ask for corrections, and we flag the items we notice early so you can plan around them. How it plays out depends on San Jose's requirements and on what was built, and we walk through that with you once we have seen the notice.
No. We handle the drawings, permit documentation and Title 24 paperwork. We do not give legal advice, represent you in a hearing or negotiate fines. If you have questions about your legal rights, a citation or an appeal, please talk to an attorney.
In general, it means the city believes work was done without the required permits or is out of compliance with code. San Jose's published process says an enforcement notice lists the violations, the required corrections and a deadline, so read it closely and note the dates. If you are not sure what it is asking for, send it to us and we will go through it with you.
Read the notice for the contact listed on it, then talk to us about the drawings, and keep any response date on the notice in mind. The inspector named on the notice and the city's Permit Center are the right people to confirm permit requirements for your case. We can help you work out what to ask and what documentation to bring.
We cannot predict the city's timeline, which depends on the case, the scope of the work and review workload. What we control is the drawing side: measuring the property, preparing accurate as-built drawings and a complete permit set, and responding to city corrections promptly. We will give you a realistic estimate for our part once we see the property.
San Jose runs an AB 2533 ADU and JADU Legalization Program for units built or converted without a permit before January 1, 2020. The city describes it as a penalty-free path built around a substandard-housing safety checklist, and it asks owners to submit as-built plans prepared by a professional, which is the drawing work we do. An older ADU amnesty program with fee waivers has ended. Terms, eligibility and fees change, so confirm current requirements with the city before relying on any of it. We can prepare the as-built drawings and permit documentation either way, and tell you what we see once we have looked at the unit.
Tell us what you're building and we'll get back to you with next steps — usually within one business day.
(408) 634-6655