As-built drawings, retroactive permit sets and Title 24 documentation for unpermitted work on parcels outside any city limits, prepared for the County of Santa Clara's planning and building review, with the septic, well, hillside and fire questions that rural and foothill properties add.
If you got a violation notice, a stop-work order or a red tag on a parcel outside any city, the agency on the other end is the County of Santa Clara, not a city hall. Building, zoning and grading violations in unincorporated areas are handled through the County's Department of Planning and Development, which has a code enforcement function that investigates complaints and sends notices. The most common starting point is work done without a permit: an ADU or garage conversion, a room addition, a deck or shed, electrical or plumbing changes, or grading and retaining walls on a slope. The usual path back is to apply for an ordinary building permit for the work that already exists, which starts with accurate as-built drawings. Two things make county parcels different. First, an open County notice can be recorded against the property, and under the County zoning rules a recorded violation can affect whether other permit applications are approved until it is resolved. Second, projects on these parcels often touch other reviewers: septic and well questions, hillside and geologic conditions, and fire access. We read your notice first, confirm the parcel really is unincorporated, and then draw only what the County is actually asking to see.
We read the County notice or posted tag, identify what it cites and what documentation it is asking for, and map the drawings and permit package needed. The notice's response dates matter, so bring it to us early.
As-built plans for converted garages, backyard units and other living space built without permits, prepared for County building review. Older units may have state ADU provisions that can help, and we flag what applies to your parcel.
Measured drawings of the existing construction exactly as built, plus an after-the-fact permit set for additions, decks, electrical and plumbing changes, grading and retaining walls, scoped to what the County cites.
If unpermitted work surfaced in a sale, an inspection report or a recorded County notice, we review what is documented, what is missing and what the as-built package would need to include. Whether a recorded notice can be cleared is the County's decision.
We read the County notice line by line, confirm your parcel is unincorporated, and list exactly what is cited, what drawings it calls for and which dates in the notice need attention.
We visit and measure the existing construction as it actually stands, including site features like slope, driveway, septic and well locations, and produce as-built drawings of what is there, not what should have been.
A retroactive permit set, with Title 24 documentation where the work triggers it, and any corrective details your engineer or the County reviewers require, assembled for submittal to the County.
When the County or a reviewing agency returns corrections, we revise the drawings and resubmit. We coordinate drawings and documentation; we do not negotiate with the County or speak for you.
Legalization drawings are a different job from drawing a new house. We know how to document existing conditions as they are, including unusual framing, mixed-era work and undocumented changes.
Reviewers compare the drawings to what they see on site. We measure in person and draw what exists, which can help reduce rework when the County inspects.
Where unpermitted structural work needs a licensed engineer's evaluation or the work triggers energy compliance, we coordinate both inside the same package instead of leaving you to chase them separately.
You deal with the person drawing your set from the first look at the notice through County corrections and resubmittal, so you do not have to explain your situation twice.
Violation notices, red tags and unpermitted work across Santa Clara, San Mateo and Alameda counties and the wider Bay Area.
There is usually a well-worn path, and you are in good company: unpermitted work turns up on many Bay Area homes, and building departments handle legalization submittals all the time. It typically starts with accurate as-built drawings, followed by a retroactive permit package scoped to what the County requires. If part of the work cannot be approved as built, the County may ask for corrections, and we flag the items we notice early so you can plan around them. How it plays out depends on the County's requirements and on what was built, and we walk through that with you once we have seen the notice.
No. We handle the drawings, permit documentation and Title 24 paperwork. We do not give legal advice, represent you in a dispute, contest a notice or negotiate penalties. If you have questions about your rights, a hearing or a recorded notice, speak with an attorney, and we will work alongside whoever you choose.
It generally means the County believes work was done without the required permit or approval. Start with the notice itself: it identifies the issuing office, what is cited and the dates you must respond by. Contact the County office named on it, and send us a copy so we can tell you what documentation is likely needed. We cannot predict how long the County's review will take once a submittal is in.
A mailing address with a city name does not prove it, because some unincorporated parcels carry a nearby city's name. The County Planning Department's online parcel lookup shows jurisdiction and zoning by APN, and the County Planning Office can confirm. If the parcel is inside a city, that city's building department handles the violation, not the County. We can check this for you first.
It can. County rules may allow the County to hold or deny other permit applications while a recorded notice of violation remains open, and how a recorded notice is released is up to the County. We cannot clear a record, but a complete as-built and permit package is usually part of the path toward resolving it. Confirm the specifics with the County and an attorney.
Possibly. Added bedrooms or living area, or an extra unit, can lead the County's Environmental Health reviewers to look at whether the septic system and water supply are adequate. We show septic, well and reserve area on the as-built site plan and tell you when your scope is likely to bring them in, since that can affect timing and what is feasible.