Notice from Campbell Code Enforcement, a stop-work order or a red tag? We measure what is actually built and prepare the as-built drawings, retroactive permit set and Title 24 documentation the city's Building Inspection Division needs to review the work.
In Campbell, Code Enforcement and the Building Inspection Division both sit within the Community Development Department. The city's Code Enforcement page lists unpermitted construction, unpermitted electrical, plumbing or mechanical work, and illegal occupancy such as converted garages and illegal additions among its issues, and it takes complaints online or by mail. Cases can also surface during another inspection or a home sale. The city's published policy says the responsible party gets a reasonable time to correct a violation voluntarily, and that if it stays open the remedies can include administrative citations or a notice recorded with the County Recorder, which stays on the title until the violation is resolved. Campbell's tight, built-out lots add a wrinkle: a converted garage, rear addition, enclosed porch or backyard structure can raise setback and lot-coverage questions on top of building-code ones. None of that changes the first step. The city needs accurate drawings of what is actually built before anyone can discuss a way forward, and that measuring, drawing and permit-documentation work is what we do. We are not attorneys or contractors, and we do not negotiate fines.
We start from the notice or posted tag: which Campbell office issued it, what it cites and every response date. Then we sort out which drawings and documents the response needs before anything is drawn.
Campbell's Code Enforcement lists converted garages and illegal additions among its issues, and the city's ADU bulletin covers legalizing unpermitted units built before 2020. We draw the space as it exists and prepare documentation for the route that fits.
Measured drawings of rear additions, enclosed porches, decks and backyard structures as they stand, with setbacks and lot coverage on the site plan, then a retroactive permit set with Title 24 documentation and engineering coordination where the work triggers them.
When a sale brings up unpermitted work, through a buyer's inspection, a permit-history search or a recorded notice on the title, we review what documentation exists and what a complete as-built package would need. Releasing a recorded notice is the city's decision.
We read the notice or tag item by item, list what is cited and which response dates apply, and work out which drawings each item calls for.
We measure the construction as it stands, including how it sits against your property lines, and flag conditions that can add review in Campbell, such as a FEMA flood area or the city's historic resource inventory.
The retroactive permit set, built for submittal through Campbell's online permit system, with Title 24 documentation and an engineer's input where the scope calls for it.
If Campbell's reviewers send back corrections or questions, we revise the drawings and resubmit them. Our role in that exchange is limited to the drawings and documentation; we do not negotiate on your behalf.
As-built and legalization work is routine for us, so we can read a Campbell notice item by item and know what a building department looks for in a retroactive submittal.
On a narrow lot, a few inches can change the setback and coverage answers, so we take our own field measurements rather than relying on old plans.
A converted garage or enclosed addition often brings energy-code documentation, and sometimes an engineer's evaluation, into the package. We coordinate both inside one project.
You deal with the person measuring and drawing your property, from the first read of the notice through any city corrections, so you explain your situation once.
Violation notices, red tags and unpermitted work across Santa Clara, San Mateo and Alameda counties and the wider Bay Area.
There is usually a well-worn path, and you are in good company: unpermitted work turns up on many Bay Area homes, and building departments handle legalization submittals all the time. It typically starts with accurate as-built drawings, followed by a retroactive permit package scoped to what Campbell requires. If part of the work cannot be approved as built, Campbell may ask for corrections, and we flag the items we notice early so you can plan around them. How it plays out depends on Campbell's requirements and on what was built, and we walk through that with you once we have seen the notice.
No. We handle the drawings, permit documentation and Title 24 paperwork. We do not give legal advice, represent you in a hearing or negotiate fines. If you have questions about your legal rights, a citation, an appeal or a notice recorded against your property, please talk to an attorney.
Put simply, the city believes something was built or altered without the permit it needed, or that the work falls short of code. In Campbell, Code Enforcement and the Building Inspection Division both sit in the Community Development Department, and the notice should say which office issued it. The city's published policy says the responsible party gets a reasonable time to comply voluntarily, so read the notice closely and note its dates.
Begin with the notice: it should name the issuing office, what is cited and your response dates, and the staff it names can confirm what it requires. Mailing addresses and city limits do not always match, so check the letterhead: a property near the city limits may be handled by another agency, such as San Jose, Los Gatos, Saratoga or Santa Clara County, rather than Campbell. Then send us a copy and we will tell you what drawings it appears to call for.
The city sets its own timeline, and we cannot predict it. It depends on what the notice cites, the scope of the work, whether an engineer's evaluation or Title 24 documentation is needed and how many rounds of corrections come back. If your notice dates look tight, tell us right away. What we control is the drawing side, and we will give you a realistic estimate for it once we have seen the notice and the property.
The city's ADU bulletin has a section on unpermitted ADUs. It describes legalizing units built before 2020 under the state's ADU amnesty provisions, generally through a regular building permit, and says the city may date a unit from aerial photos, county records or affidavits. It also says the city can require corrections instead if the Building Official finds they are needed to protect health and safety. A room that is not a separate unit may follow a different route, and terms change, so confirm current requirements with the city. Either way, our first step is measuring and drawing the space as it exists.
Tell us what you're building and we'll get back to you with next steps — usually within one business day.
(408) 634-6655