Violation notice, stop-work order or unpermitted work on a Monte Sereno property? We prepare the as-built drawings, retroactive permit set and Title 24 documentation for the city's Building and Planning Departments, including the lot coverage figures its plot plan calls for.
Monte Sereno is a very small, almost entirely residential city, and permits, inspections and design review run through its Building and Planning Departments with a small staff rather than a large enforcement office. A case can start with a report to the city, with an inspection, or with a permit application or home sale that turns up work nobody permitted. Examples include a converted garage or outbuilding, an accessory building over 120 square feet or with electrical or plumbing, an addition or roof change that would normally have needed a Site Development Permit, an entry column or front-yard fence over the height limit, and retaining walls or grading on a slope. The city's code describes notices of violation with a date to correct, administrative citations and, if a violation stays unresolved, recording the notice against the property. The first step is usually accurate drawings of what is actually built, including lot coverage, since the city counts some accessory buildings toward structural and impervious coverage. That is our part. We are not attorneys, we do not negotiate fines or speak for you at hearings, and we do not do the construction.
We read the notice, red tag or stop-work order, note its dates and the Monte Sereno staff member named on it, and work out which drawings and documents the response calls for, so the drawings we prepare are aimed at what the notice raises.
As-built drawings and a retroactive permit set for converted garages, outbuildings and backyard units, checked against the city's ADU standards (including its sanitary sewer requirement) and any state provisions for older unpermitted ADUs.
We draw additions, accessory buildings, decks, retaining walls and remodels as they stand today, add the structural and impervious coverage figures the city's checklist asks for, and build the retroactive permit set around them, with Title 24 documentation when the work calls for it.
When a sale surfaces unpermitted work, through a buyer's inspection, a permit-history review or a recorded notice, we go through what is documented, what is missing and what resolving it would involve. The city's code sets conditions for clearing a recorded notice, including corrections and finalized permits, and the city decides when they are met.
We read the notice closely, note every correction and response date, and sort out which items sit with the building side and which may involve planning, so the drawings answer what the city actually raised.
We visit and measure what was actually built, including accessory buildings, decks, hardscape and distances to property lines, so the setback and coverage figures reflect what is really there.
A retroactive permit set prepared to the city's submittal requirements, with Title 24 documentation and engineer coordination where the scope or a sloped lot calls for it.
When the Building Department, planning staff or county fire reviewers send corrections or questions, we revise and resubmit the drawings until the submittal has been fully reviewed.
We handle as-built and retroactive permit work regularly, so matching a notice to the city's submittal checklist is familiar ground, and we flag likely questions early.
Every dimension comes from field measurement of what is actually there, which matters in a city whose plot plan asks for structural and impervious coverage figures.
When unpermitted structural, grading or energy-related work needs an engineer's evaluation, soils input or Title 24 paperwork, we coordinate it inside the same project.
The person who reads your notice also measures, draws and answers the city's corrections, so with a small city staff on the other side you explain your situation once.
Violation notices, red tags and unpermitted work across Santa Clara, San Mateo and Alameda counties and the wider Bay Area.
There is usually a well-worn path, and you are in good company: unpermitted work turns up on many Bay Area homes, and building departments handle legalization submittals all the time. It typically starts with accurate as-built drawings, followed by a retroactive permit package scoped to what Monte Sereno requires. If part of the work cannot be approved as built, Monte Sereno may ask for corrections, and we flag the items we notice early so you can plan around them. How it plays out depends on Monte Sereno's requirements and on what was built, and we walk through that with you once we have seen the notice.
No. We handle the drawings, permit documentation and Title 24 paperwork. We do not give legal advice, represent you in a hearing or negotiate fines. If you have questions about your legal rights, a citation, an appeal or a notice recorded against your property, please talk to an attorney.
In general, it means the city believes work was done without a required permit or is out of compliance with code. The city's code names officials such as the Code Enforcement Officer and the Building Official as the ones who can issue notices, and says a notice should list the code sections cited, the corrections needed and a date to correct them, so note every date. Leave a posted stop-work order in place. Read the notice carefully for what the city requires, and check with the city if anything is unclear.
Read the notice for the contact named on it and every response date, then send us a copy so we can tell you what drawings it is likely to need. The city's building and planning staff can confirm permit requirements for your case, and their counter keeps limited posted hours, so check them or call ahead. Also confirm the notice comes from the City of Monte Sereno, since some parcels near the city, including hillside land, can fall under Santa Clara County instead, which follows a different process.
We cannot predict the city's timeline. It depends on the case, the scope of the work and review workload, and here also on whether planning review such as a Site Development Permit is involved, whether the city wants a soils report, whether plans go to county fire review, and how many correction rounds come back. What we control is the drawing side: measuring, drawing, assembling a complete permit set and answering corrections promptly. We will give you a realistic estimate for our part once we see the property.
They can matter. Monte Sereno's handouts indicate that many projects, such as larger additions, new structures and some exterior changes, may go through a Site Development Permit reviewed by the Site and Architectural Commission, and the city's handout indicates that accessory buildings can count toward a lot's structural and impervious coverage, depending on type and size. If unpermitted work would normally have gone through that review, or adds coverage to a tight lot, planning may be involved along with the building side, and the city decides how that applies to work already built. On a slope, grading, drainage and a soils report can come up too, and we flag these at the site visit.
Tell us what you're building and we'll get back to you with next steps — usually within one business day.
(408) 634-6655