Notice from San Ramon Code Enforcement, a stop-work order or a permit problem found in a sale? We prepare the as-built drawings, retroactive permit sets and Title 24 documentation the city needs to review the work, including for HOA and Dougherty Valley homes.
In San Ramon, building permits and code enforcement sit in the same division. Building and Safety Services, part of the Community Development department, reviews permits and inspects construction, and its Neighborhood Preservation staff investigate alleged violations of the municipal and zoning codes. The city lists illegal construction or occupancy among the issues it handles, and its FAQ says violations can be reported anonymously, so a notice can come from a neighbor's report as well as from an inspection or a home sale. The city says it first seeks voluntary compliance when nothing poses an immediate safety danger, and the steps it lists after that include a correction notice, stop work order, administrative hearing and citation. San Ramon adds local layers: Dougherty Valley has its own zoning standards and design guidelines, many planned communities add HOA review, additions and exterior improvements may need architectural review with Planning before building permits issue, depending on the scope and the site, and hillside, creek or ridgeline sites can bring extra standards. None of that changes the first step, which is accurate drawings of what is actually built. That is the part we do; we are not attorneys, we do not negotiate fines and we do not do the construction.
We read the courtesy warning, correction notice or stop-work order, identify what San Ramon's Neighborhood Preservation and Building and Safety Services staff are asking for, and map out the drawings and documents the response needs.
For a garage or backyard structure turned into living space without a permit, we draw the existing conditions and prepare the legalization package, weighing San Ramon's ADU standards, the state's AB 2533 pathway for certain pre-2020 units and outside approvals such as the fire district.
Accurate drawings of additions, patio covers, decks and remodels exactly as built, followed by a retroactive permit set scoped to what Building and Safety Services requires, with Title 24 documentation and engineering coordination where the work triggers them.
If a buyer's inspection, appraisal or permit-history search flagged unpermitted work on a San Ramon home, we assess what documentation exists, what is missing and what it would take to resolve, and note where HOA records may also matter.
We go through the courtesy warning, correction notice, stop-work order or inspection report line by line, note the response dates and list what the city is asking for.
We measure the home and any unpermitted structures on site and draw the existing conditions as they are, including slopes and grading on hillside or creek-side lots.
A retroactive permit set prepared for San Ramon's online permit portal, with Title 24 documentation and engineer coordination where needed, plus what Planning may want for additions and exterior changes.
If San Ramon's plan check, Planning or an outside agency returns comments, we revise the drawings and resubmit. Our role is drawings and documentation, not negotiating for you.
We handle as-built and legalization projects regularly and have drawn plans across San Ramon and the Tri-Valley for years, so we know how to read a notice and what a retroactive submittal needs.
Every drawing comes from field measurements of what is actually there, not the original tract plans or an old HOA submittal that may no longer match the house. Everything else builds on that.
When unpermitted structural, electrical or energy-related work needs an engineer's evaluation or Title 24 documentation, we coordinate it within the same project.
You work with the person doing the drawings from the first notice review through the city's corrections, including Planning, outside agency or HOA questions that touch the drawings.
Violation notices, red tags and unpermitted work across Santa Clara, San Mateo and Alameda counties and the wider Bay Area.
There is usually a well-worn path, and you are in good company: unpermitted work turns up on many Bay Area homes, and building departments handle legalization submittals all the time. It typically starts with accurate as-built drawings, followed by a retroactive permit package scoped to what San Ramon requires. If part of the work cannot be approved as built, San Ramon may ask for corrections, and we flag the items we notice early so you can plan around them. How it plays out depends on San Ramon's requirements and on what was built, and we walk through that with you once we have seen the notice.
No. We handle the drawings, permit documentation and Title 24 paperwork. We do not give legal advice, represent you in a hearing or negotiate fines. For questions about your rights, a citation, an administrative hearing or an HOA dispute, please talk to an attorney.
In general, it means the city believes work was done without a required permit or is out of compliance with code. In San Ramon, code enforcement is carried out by Neighborhood Preservation staff in Building and Safety Services, and the city's own terms include courtesy warning, correction notice and stop work order, so your document may not say red tag at all. Check it for who issued it, what it cites and its response dates, and send it to us if anything is unclear.
Read the notice for its response date and the staff contact listed on it. San Ramon's Neighborhood Preservation and Building and Safety Services staff can confirm what the city requires, and Planning Services answers zoning questions. Then send us a copy and we will tell you what drawings to expect and what to ask the city. If the date is close, tell us right away. If the notice raises legal questions, speak with an attorney before you respond.
We cannot predict the city's timeline. It depends on the scope of the work, whether an engineer's evaluation is needed, whether Planning's architectural review or an outside agency such as the San Ramon Valley Fire Protection District gets involved, and how many correction rounds come back. We control the drawing side: measuring, preparing accurate as-built drawings and a complete permit set, and answering corrections promptly. We will estimate our part once we have seen the notice and the property.
It can add a step. The city says Dougherty Valley, which includes Gale Ranch and Windemere, has zoning standards and design guidelines specific to that development, so we confirm what applies to your address. Separately, an HOA architectural committee usually reviews exterior work on its own track, so city approval does not replace HOA approval, or the reverse. Send us any HOA approval letters you have. We note HOA questions that touch the drawings, but how an HOA enforces its rules is between you and the association, and an attorney can advise on that.
Tell us what you're building and we'll get back to you with next steps — usually within one business day.
(408) 634-6655