Unpermitted work or a stop-work notice in Los Altos Hills? We prepare the as-built drawings, retroactive permit sets and Title 24 documentation for the Town's Planning and Building review, with slopes, easements, heritage oaks and septic systems in view.
In Los Altos Hills, code enforcement complaints go to the Town's Planning Department, while building permits, plan check and inspections belong to the Building Department. Residents can file a Code Enforcement Investigation Request or use the Town's Report a Concern portal, and the Town's form says the reporter's contact details are kept confidential, so a notice can arrive without warning. Other triggers are a permit that expired without a final inspection, or a home sale where a deck, pool house, converted garage or retaining wall shows up in a report. The Town's code calls for a notice to list the violations, the corrections required and a deadline, and an unresolved notice can be recorded against the property, with other permits held back until it is released. The lot adds its own layers: floor-area and development-area limits (development area counts decks, patios, pools and driveways too), open space easements that the Town says affect a large percentage of its properties, heritage oaks, steep slopes and, in many neighborhoods, a septic system reviewed by the County. The first step is still accurate drawings of what exists, which is the part we do. We are not attorneys, we do not negotiate fines and we do not do the construction.
We go through the notice or stop-work order, work out whether Planning or Building issued it and what each office is asking for, and map the drawings and records the response needs, so you know the scope before committing to a plan.
Measured as-built drawings and a retroactive permit set for garages, backyard units and other unpermitted living space, checked against the Town's ADU siting limits (such as slopes, creek setbacks and easements) and state rules for older units, noting where added bedrooms or baths could bring in County septic review.
Drawings of additions, decks, pool houses and retaining walls exactly as built, with floor area and development area worked out for your lot, then a retroactive package for the Town's planning and building review, with Title 24 and engineering coordination where the work triggers them.
If a buyer's inspection, permit-history search or appraisal flagged unpermitted work on a Los Altos Hills home, we compare the Town's records with what is built and outline what exists, what is missing and what it would take to resolve, including easement and septic questions.
We go through the notice or stop-work order line by line, look at the Town's permit history for your address and note every response date, so the drawings answer what Planning or Building is actually asking for.
We measure what was actually built, including decks, patios, retaining walls and drainage, and plot it against slopes, creeks, heritage oaks, recorded easements and the septic system, so the drawings reflect the real site, not old plans.
A retroactive package scoped to what the Town requires, which may include planning review before building plan check, with Title 24 / CF1R documentation, engineer or geotechnical coordination for hillside work, and County septic review if bedrooms or baths were added.
If Town planning or building staff come back with comments, we revise the drawings and resubmit through each round, including any fire, geotechnical or engineering input, until the package has been fully reviewed.
Violation and legalization projects are a regular part of our work, so we know how to read a notice and what planning and building staff expect in a retroactive submittal, including on sloped lots with easements and trees.
We measure the property in person and draw what is there. On a Los Altos Hills lot, those existing conditions also feed the floor-area and development-area math, so one error can ripple through the whole package.
Hillside and retaining-wall work can call for an engineer's review or geotechnical input, and added living space brings Title 24 paperwork. We coordinate both inside the same project, so you are not chasing separate consultants.
The person who reads your notice is the person who measures, draws and answers the Town's comments, so you explain your situation once.
Violation notices, red tags and unpermitted work across Santa Clara, San Mateo and Alameda counties and the wider Bay Area.
There is usually a well-worn path, and you are in good company: unpermitted work turns up on many Bay Area homes, and building departments handle legalization submittals all the time. It typically starts with accurate as-built drawings, followed by a retroactive permit package scoped to what the Town requires. If part of the work cannot be approved as built, the Town may ask for corrections, and we flag the items we notice early so you can plan around them. How it plays out depends on the Town's requirements and on what was built, and we walk through that with you once we have seen the notice.
No. We handle the drawings, permit documentation and Title 24 paperwork. We do not give legal advice, represent you in a hearing or negotiate fines. If you have questions about your legal rights, a citation, a recorded notice or an appeal, please talk to an attorney.
In general, it means the Town believes work was done without a required permit or is out of compliance with code. Under the Town's code, formal notices of code violation come through the Planning Department, while the Building Department handles permits and inspections and can halt work that violates the building code, so a stop-work notice may come from either. Never remove a posted notice. Read it for what was found, what must be corrected and by when, and send it to us if anything is unclear.
Read the notice for the staff contact and every response date. The Planning and Building departments can confirm what your case requires, and the Town's code may allow an owner to ask to meet with planning staff, so check your notice for that option and any deadline. Then send us a copy and we can tell you what drawings are needed. If the notice raises legal questions, speak with an attorney first.
We cannot predict the Town's timeline. It depends on the scope, whether planning review (a site development or zoning permit) comes before building plan check, which review level applies, from staff level to Planning Commission, whether geotechnical, fire, engineering or County septic reviews are involved, and how many correction rounds follow. Our own part, measuring, drawing and assembling the submittal, is something we can put a realistic estimate on once we have seen the notice and the property.
It can change the conversation. The Town's own guidance says a large percentage of Los Altos Hills properties include a recorded open space easement, typically over steep slopes, creek corridors or heritage oaks, that generally restricts structures, grading and tree or vegetation removal, and that unauthorized activity inside one is subject to Town code enforcement. Heritage oak removal needs its own Town permit. If you are unsure whether your parcel has an easement, check your title documents or ask the Planning Department. We plot easements, creeks and trees on the as-built site plan and flag conflicts early; what can be resolved is the Town's decision, and an attorney can advise on your rights.
Tell us what you're building and we'll get back to you with next steps — usually within one business day.
(408) 634-6655