20+ years combined team experience — Call (408) 634-6655 →
Unpermitted Work Legalization

Work done without a permit? Here is how to make it legal, with or without a notice.

As-built drawings, retroactive permit sets and Title 24 coordination to legalize additions, conversions and other unpermitted work with your city's building department.

Get a Free Quote Call (408) 634-6655

What are you building?

Pick a project type and we'll scroll you to the request form.

Get My Free Quote

FREE · NO OBLIGATION

Start Here

Three ways in, depending on where you are.

I already have a notice

A red tag, stop-work order or notice of violation changes the starting point. Our code violation page explains how we help.

Code violation and red tag help →

It is a pre-2020 ADU or garage conversion

A state law, AB 2533, gives older unpermitted ADUs and junior ADUs a safety-focused path to a permit.

ADU legalization (AB 2533) →

Something else, and no notice

Additions, enclosed patios, finished basements, decks and more. The rest of this page walks you through the path.

See how it works →

What Counts

Common kinds of unpermitted work.

Work that usually needs a permit includes the examples below. Cities also publish their own lists of small projects that do not need one, so what applies to you depends on where you live.

Additions and enclosed space

Room additions, enclosed patios or porches, and finished attics or basements that were never permitted.

Garage and backyard conversions

Garages, sheds and backyard structures turned into living space.

Decks and patio covers

Raised decks, covered patios and similar structures built without plans or inspections.

Electrical, plumbing and mechanical

Panel upgrades, added circuits, water heaters, HVAC and plumbing changes done without a permit.

Remodels that moved walls

Interior remodels that removed or changed walls, openings or the layout.

Work by a previous owner

Changes made before you bought the home that turn up later in a report or inspection.

Know What Is On File

The first step is finding out what the city already has.

Many cities let you search a property's permit history online by address, and some also keep older records that you request from the building department. Comparing that history with what is actually built shows what was never permitted, and it keeps you from guessing.

What Happens To The Work

Legalize it, correct it, or in some cases remove it.

Approved as built

Some work can be approved as it stands once accurate drawings and the right permits are in place.

Approved with corrections

Some work needs changes, such as safety, structural or electrical fixes, before the city signs off.

May not be approvable as built

Work that conflicts with zoning limits, such as setbacks, height or lot coverage, may have to be reduced or removed. We tell you early if we see that risk, and the city decides what it will approve.

How It Works

From unpermitted work to a permit package your city can review.

Click a stage, or let it play — this is the path from unpermitted work to a legalization submittal.

Permit History Review
As-Built Measure
As-Built Drawings
Retroactive Permit Set
City Review and Corrections
Inspection and Sign-Off
01 / 06

Permit History Review

We look at what permits and records the city has for your address and compare them with what you describe.

0%
When It Comes Up

Most people find out at a moment like these.

Buying or selling

A buyer's inspection, an appraisal or a permit-history search can show work that was never permitted.

Refinancing or appraisal

A lender's appraiser may notice added space or changes that do not match the city's records.

Planning a new project

Applying for a permit on the same house can lead the city to look at earlier unpermitted work.

Tell us about the work.

Send a few photos and a short description, and we'll tell you what your city is likely to ask for and what a realistic first step looks like.

Get a Free Quote
FAQ

Questions homeowners ask us

It usually starts with a look at what the city has on file, then accurate as-built drawings of what exists, a retroactive permit package, and the city's review and inspection. How it plays out depends on your city and on what was built, and we walk through that with you once we have seen the work.

Sometimes, and sometimes not. It depends on your city's rules for existing work and on how significant the work is. For some older ADUs, state law focuses on health and safety instead, as described on our AB 2533 page. We tell you what we expect your project to require once we have seen it, and the city makes the final call.

Then the options are usually to change it so it can be approved or to remove it. We tell you early if we see that risk, for example when setbacks, height or lot coverage are involved, but the city decides what it will approve.

Yes. We can review what has been flagged, check what documentation exists or is missing, and give you a realistic sense of what it would take to resolve, before or after closing.

No. We prepare drawings, permit documentation and Title 24 paperwork, and we coordinate with licensed engineers when they are needed. Any corrective construction is done by a licensed contractor, and the city handles inspections.

No. We handle the drawings and permit documentation side. We do not give legal advice, represent you in a hearing or negotiate fines. If you have questions about your rights, a notice or a dispute, please talk to an attorney.

Related services

Code Violation & Red Tag Removal →ADU & JADU Legalization (AB 2533) →

Free, No-Pressure Estimate

Let's talk about your project.

Tell us what you're building and we'll get back to you with next steps — usually within one business day.

(408) 634-6655