As-built drawings, retroactive permit sets and Title 24 coordination to legalize additions, conversions and other unpermitted work with your city's building department.
A red tag, stop-work order or notice of violation changes the starting point. Our code violation page explains how we help.
A state law, AB 2533, gives older unpermitted ADUs and junior ADUs a safety-focused path to a permit.
Additions, enclosed patios, finished basements, decks and more. The rest of this page walks you through the path.
Work that usually needs a permit includes the examples below. Cities also publish their own lists of small projects that do not need one, so what applies to you depends on where you live.
Room additions, enclosed patios or porches, and finished attics or basements that were never permitted.
Garages, sheds and backyard structures turned into living space.
Raised decks, covered patios and similar structures built without plans or inspections.
Panel upgrades, added circuits, water heaters, HVAC and plumbing changes done without a permit.
Interior remodels that removed or changed walls, openings or the layout.
Changes made before you bought the home that turn up later in a report or inspection.
Many cities let you search a property's permit history online by address, and some also keep older records that you request from the building department. Comparing that history with what is actually built shows what was never permitted, and it keeps you from guessing.
Some work can be approved as it stands once accurate drawings and the right permits are in place.
Some work needs changes, such as safety, structural or electrical fixes, before the city signs off.
Work that conflicts with zoning limits, such as setbacks, height or lot coverage, may have to be reduced or removed. We tell you early if we see that risk, and the city decides what it will approve.
Click a stage, or let it play — this is the path from unpermitted work to a legalization submittal.
We look at what permits and records the city has for your address and compare them with what you describe.
A buyer's inspection, an appraisal or a permit-history search can show work that was never permitted.
A lender's appraiser may notice added space or changes that do not match the city's records.
Applying for a permit on the same house can lead the city to look at earlier unpermitted work.
It usually starts with a look at what the city has on file, then accurate as-built drawings of what exists, a retroactive permit package, and the city's review and inspection. How it plays out depends on your city and on what was built, and we walk through that with you once we have seen the work.
Sometimes, and sometimes not. It depends on your city's rules for existing work and on how significant the work is. For some older ADUs, state law focuses on health and safety instead, as described on our AB 2533 page. We tell you what we expect your project to require once we have seen it, and the city makes the final call.
Then the options are usually to change it so it can be approved or to remove it. We tell you early if we see that risk, for example when setbacks, height or lot coverage are involved, but the city decides what it will approve.
Yes. We can review what has been flagged, check what documentation exists or is missing, and give you a realistic sense of what it would take to resolve, before or after closing.
No. We prepare drawings, permit documentation and Title 24 paperwork, and we coordinate with licensed engineers when they are needed. Any corrective construction is done by a licensed contractor, and the city handles inspections.
No. We handle the drawings and permit documentation side. We do not give legal advice, represent you in a hearing or negotiate fines. If you have questions about your rights, a notice or a dispute, please talk to an attorney.