Permit-ready drafting for Monte Sereno ADUs, additions, remodels and new homes — drawn to fit the city's zoning districts, coverage limits and Site Development Permit review.
Monte Sereno is a very small, almost entirely residential city, and its rules are written to keep it that way. Single-family lots are split across the R-1-8, R-1-20 and R-1-44 zoning districts, each with its own coverage limits, setbacks and ADU size allowances, and the city measures floor area, building height and structural and impervious coverage in ways that differ from nearby cities. Many projects, especially new homes, larger additions and anything on a sloped lot, go through a Site Development Permit with review by the city's Site and Architectural Commission, where massing, trees, grading and neighbor context all get a close look. Plans drawn with a generic template tend to miss those details. We start by confirming your zoning district, lot slope and tree situation, then draw to Monte Sereno's own submittal requirements instead of a one-size-fits-all checklist.
Detached, attached and junior ADU plans sized and sited to Monte Sereno's ADU standards, including the sanitary sewer connection requirement, the city's detached-ADU height and setback rules, and its design and utility requirements.
Room and second-story addition drawings coordinated with Monte Sereno's height, setback and floor-area rules and, where an addition triggers a Site Development Permit, the streetscape and neighbor-context information the Site and Architectural Commission asks to see.
Interior and exterior remodel drawings for kitchens, baths and whole-house renovations, scoped for whichever level of building permit and planning review your project triggers.
Ground-up custom home drawings and garage-to-living-space conversions prepared for Monte Sereno submittal, with grading, drainage, trees and massing worked in early on larger and sloped lots.
We review your lot, existing structure and goals, and confirm your zoning district, lot slope, mature trees and whether your scope is likely to need a Site Development Permit before any drawing starts.
Full drawing set prepared to Monte Sereno's submittal requirements, including the Project Summary Form, site plan, floor plans, elevations, sections, roof plan and landscape and tree information that city reviewers look for.
Energy compliance, structural calculations and, where the city asks for them, soils and grading engineering coordinated into the same submittal package.
If the city comes back with corrections or Site and Architectural Commission comments, we revise and resubmit. We don't disappear after the first drawing set goes out.
Two decades drawing plans for Monte Sereno and the surrounding cities, not a generic national template.
Drawings prepared under professional design standards, not just CAD line work, which matters in a city where design review looks closely at massing and neighbor context.
The city publishes its own handouts for ADUs, development standards and Site Development Permits, and revises them. We draw against the current versions, not last year's.
You work directly with the person drawing your plans, from first sketch through planning review and building plan check corrections.
Based in San Jose, working throughout Santa Clara, San Mateo and Alameda counties and the wider Bay Area.
It depends on the project. Many ADUs, additions and remodels can be permitted with drafted plans, but structural calculations are part of the city's building permit application requirements, and larger grading work needs a licensed engineer's stamped plan. The city's Site Development Permit handout, for example, calls for an engineer-stamped grading and drainage plan once grading goes over 50 cubic yards. We'll tell you upfront what your project needs and can coordinate engineering as part of the drawing package.
That depends on scope, and the city's own handouts are the final word. In general, new houses, additions and hillside development (parcels with an average slope over 10%) are the kinds of projects the city routes through a Site Development Permit, which involves review by the Site and Architectural Commission, story pole or netting requirements and neighbor outreach. We'll tell you during the site walk whether your scope is likely to need one, and confirm with the Planning Department before you commit to a design.
Most single-family lots qualify for at least one ADU under state and local rules. The city's ADU handout notes that the parcel must be connected to the sanitary sewer, lists a 16-foot height limit for detached ADUs and 4-foot minimum side and rear setbacks, and sets size limits by zoning district. Because the districts differ, we confirm your specific parcel and its zoning before we draw anything.
The city's ADU handout says an ADU of 800 square feet or less is not counted toward structural and impervious coverage, while the full floor area of a larger ADU is counted. Coverage is already tight on many Monte Sereno lots, so we run the coverage numbers for the whole property, including any new driveway or patio area, before settling on an ADU size.
Yes. The city has a slope-density formula for lots with a slope of 10% or greater, and its development standards note that it can increase the required lot size and reduce allowable house size and impervious coverage. Hillside projects also bring grading, drainage and, typically, a soils report. We flag all of that during the site walk so it's planned for from the start instead of surfacing as a correction later.
We can't predict the city's timeline. It varies with scope, submittal volume and whether a Site Development Permit applies, and a project that needs Commission review will take longer than a simple remodel. To start, we need your site address, a rough scope, and a copy of your survey or existing floor plan if you have one. If you don't have a survey, we can help you get one, and it matters most on sloped lots.
Tell us what you're building and we'll get back to you with next steps — usually within one business day.
(408) 634-6655