Permit-ready drafting for ADUs, additions, remodels and new homes on parcels outside any city limits — drawn for the County of Santa Clara's planning and building review, plus the hillside, fire, septic and well questions that rural and foothill properties bring with them.
A lot of Santa Clara County homeowners are surprised to learn their address isn't inside any city. Foothill and mountain areas near Los Gatos, Saratoga and Cupertino, rural pockets on the east and south sides, and a few islands that sit inside or beside San Jose can all be unincorporated, which means there is no city hall to submit to. Planning and building permits go through the County's Department of Planning and Development under the County's own zoning and building ordinances, and the project often picks up other reviewers too: the County Fire Marshal on fire and building code, Environmental Health on septic and wells, and grading and hillside review on steep ground. A plan set drawn on city-style assumptions tends to miss those layers. We start by confirming who actually has jurisdiction over your parcel and what that parcel's site conditions are, then draw to that.
Detached, attached and junior ADU plans for parcels the County permits, sited around the County's setback and height standards, the state ADU allowances, and rural utilities: septic or sewer, water supply, and driveway access for emergency vehicles.
Room and second-story addition drawings coordinated with County zoning, and with septic capacity, hillside siting and fire-code questions where your parcel brings them in.
Interior and exterior remodel drawings for kitchens, baths and whole-house renovations, scoped for whichever County review your project triggers, including Environmental Health when bedrooms or footprint change on a septic parcel.
Ground-up custom home drawings and garage-to-living-space conversions prepared for County submittal, with site approval, grading, drainage, fire access and wildland-urban interface construction worked in early.
We confirm your parcel is unincorporated, review your lot, existing structure and goals, and flag County-specific items up front: slope, access road, septic and well, and fire exposure.
Full construction drawing set — site plan, floor plans, elevations, sections and details — prepared to the County's submittal requirements, with driveway, grading and utility information shown where reviewers expect it.
Energy compliance and, where needed, structural and foundation review for slopes and retaining walls, coordinated into the same submittal package.
If the County or one of its reviewing agencies comes back with corrections, we revise and resubmit. We don't disappear after the first drawing set goes out.
Two decades drawing plans across Santa Clara County, including foothill and rural properties that permit through the County instead of a city.
Drawings prepared under professional design standards, not just CAD line work, which matters when a site has slope, access and utility constraints to resolve.
County ordinances, state ADU law and fire-code amendments change over time. We confirm the current County standard for your parcel before we draw.
You work directly with the person drawing your plans, from the first site conversation through County plan check corrections.
Based in San Jose, working throughout Santa Clara, San Mateo and Alameda counties and the wider Bay Area.
A mailing address with a city name isn't proof, since some unincorporated parcels carry a nearby city's name or sit next to or inside a city. The County Planning Department's online Property Profile tool shows a parcel's jurisdiction and zoning when you look it up by APN, and the County Planning Office can confirm it for you. Your property tax bill and the County Assessor's parcel records are other places to check. We can also confirm it for you before you commit to anything.
The County of Santa Clara's Department of Planning and Development handles land use and building permits for unincorporated parcels. Depending on the project, other County reviewers can be involved too, including the County Fire Marshal on fire and building code matters and Environmental Health for septic and well questions. Which of these apply depends on your parcel and scope, so we map that out during the site walk.
It can affect it a great deal. On septic parcels, adding bedrooms or living area, or adding an ADU, can mean the County's Environmental Health review looks at whether the existing system and its reserve area are adequate. Water supply for a new unit also has to be addressed. We ask about your septic and well early, show them on the site plan, and tell you when your scope is likely to need Environmental Health involvement, since that can shape what's feasible and how the project is sequenced.
Many unincorporated parcels sit in or near wildland areas, where fire-hazard construction rules, defensible space and emergency vehicle access all matter. The County Fire Marshal has a published standard for access roads and driveways serving one- and two-family dwellings that applies to unincorporated parcels, and the County's building code includes amendments for fire-hazard and wildland-urban interface areas. Which fire agency serves your address and which rules apply depend on its location, so we confirm that with the County and design the driveway, materials and sprinkler question accordingly.
It can. The County has hillside and grading guidelines, and development on steeper slopes generally gets closer scrutiny; slopes over 30 percent in particular call for special County approval and are difficult to build on. Parcels in mapped geologic hazard areas can also need technical reports. We review your parcel's slope and any mapped hazards during the site walk, bring in a geotechnical or civil engineer when needed, and tell you honestly if a proposed building location looks problematic before you spend money on full drawings.
Often, yes, but the rules are not the same as in a city. The County has its own ADU ordinance, which works alongside California's state ADU law. For a new detached unit, the County's building site approval for the primary residence is generally needed before the ADU permit application, and the ADU must satisfy water supply and wastewater (septic or sewer) requirements. Fire access and slope can limit where a unit can go. We confirm eligibility for your specific parcel and can't predict the County's plan check timeline, but we can show you what the review will look at before we draw.
Tell us what you're building and we'll get back to you with next steps — usually within one business day.
(408) 634-6655